BMR ENERGY’S SPANISH TOWN FACILITY
Building Renewable Resilience in St. Croix
Background
The Caribbean has been shifting towards a more renewable energy supply over the past decade. Since the massive devastation of Hurricanes Irma and Maria in 2017 however, “resilience” has been at the crux of conversations as governments rebuild infrastructure and consider future development.
The Spanish Town solar farm in St. Croix, U.S. Virgin Islands—in operation since 2015—received significant damage during the 2017 hurricanes. The plant remained offline for nearly 5 months, while grid repairs were implemented, and production was limited to less than 45 percent of its energy capacity once reenergized. BMR restored the plant to full capacity, with improved storm resilience, by November 2018. The solar farm was honored with the 2019 Best Resilience Project Award by the Caribbean Renewable Energy Forum (CREF).
4 megawatts of power
16,000 solar panels and 9 inverters
Located in St. Croix, U.S. Virgin Islands
Returned to full operation November 2018
In June 2018, BMR Energy acquired the plant from NRG Energy, Inc. and implemented efforts to restore and enhance the facility, while quickly returning it to service.
Impact
Supplies power for approximately 1,600 homes in St. Croix.
Power provided to the local grid decreases the amount of fuel oil that needs to be burned to provide electricity.
Reduces greenhouse gas emissions by 7,200 tons of CO2 equivalent per year—the equivalent of taking 1,400 cars off the road each year.
Increases facility resilience and promotes energy stability for St. Croix by utilizing outdoor-rated solar panels and inverters.
Process
When BMR acquired the facility, we found that all the electrical equipment, inverters, SCADA System, etc. had been exposed to full force of Hurricane Maria and were beyond repair. New inverters, SCADA and other electrical equipment were installed, and the building that housed the equipment was refurbished to be weatherproof. In addition, the hurricane force winds had resulted in the deformation of about 25% of the solar module racking and about 10% of the modules were damaged.
All electrical equipment replacement, racking repairs and module replacements were completed within 5 months allowing the plant to be recommissioned and returned to service in November 2018. The plant has been operating continually since recommissioning.